Cost-Benefit Analysis of Single Unit Systems Using Matlab
| dc.contributor.author | Jindal, Chetan | |
| dc.contributor.supervisor | Kumar, Jitender | |
| dc.date.accessioned | 2012-07-26T08:06:58Z | |
| dc.date.available | 2012-07-26T08:06:58Z | |
| dc.date.issued | 2012-07-26T08:06:58Z | |
| dc.description.abstract | The present chapter focuses on the development of a stochastic model for a one-unit system in which unit fails completely either directly from normal mode or via partial failure. The partially failed operating unit is shutdown after a maximum operation time for preventive maintenance (PM). There is a single server who attends the system immediately whenever needed. The unit becomes degraded after repair. The server inspects the degraded unit at its failure to see the feasibility of repair. If the repair of the degraded unit is not feasible, it is replaced by new unit. The distributions of failure, maximum rate of operation times, preventive maintenance, inspection and repair time of the unit are arbitrary distributed. By using regenerative point technique some reliability characteristic of interest are also obtained. | en |
| dc.format.extent | 865828 bytes | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.uri | http://hdl.handle.net/10266/1791 | |
| dc.language.iso | en | en |
| dc.subject | MTSF, Availability, Busy Period | en |
| dc.title | Cost-Benefit Analysis of Single Unit Systems Using Matlab | en |
| dc.type | Thesis | en |
