Short Range Fixed Head Multi Objective Hydrothermal Scheduling Using Fuzzy Decision Making Technique

dc.contributor.authorDhingra, Karanveer
dc.contributor.supervisorKaur, Manbir
dc.date.accessioned2010-08-26T07:50:07Z
dc.date.available2010-08-26T07:50:07Z
dc.date.issued2010-08-26T07:50:07Z
dc.descriptionM.E. (Power Systems & Electric Drives)en
dc.description.abstractIn the multi objective framework, fuzzy decision making methodology is exploited to decide the generation schedule of a short range fixed head hydrothermal problem. The multi objective problem is formulated considering three objectives (i) Fuel cost (ii) 2SOemission (iii)2CO emission which are random variables. The solution set of such formulated problems is non inferior due to contradictions among the objectives taken. The weighting method is used to simulate the trade off relation between the conflicting objectives in the non inferior domain. Once the trade-off has been obtained, fuzzy set theory helps the system operator to choose the weighting pattern and thus the operating point that maximizes the satisfaction of all the objectives.en
dc.description.sponsorshipEIEDen
dc.format.extent3130264 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.urihttp://hdl.handle.net/10266/1184
dc.language.isoenen
dc.subjectshort rangeen
dc.subjectfixed headen
dc.titleShort Range Fixed Head Multi Objective Hydrothermal Scheduling Using Fuzzy Decision Making Techniqueen
dc.typeThesisen

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1184.pdf
Size:
1.18 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.78 KB
Format:
Item-specific license agreed upon to submission
Description: