Short Range Fixed Head Hydro Thermal Scheduling Using PSO
| dc.contributor.author | Singh, Surender | |
| dc.contributor.supervisor | Narang, Nitin | |
| dc.date.accessioned | 2010-09-08T10:26:38Z | |
| dc.date.available | 2010-09-08T10:26:38Z | |
| dc.date.issued | 2010-09-08T10:26:38Z | |
| dc.description | M.E. (Power Systems and Electric Drives) | en |
| dc.description.abstract | Operation of a system having both hydro and thermal plants is quit more complex. As hydro-power plants have negligible operating cost, but hydro-power plant have higher capital cost in comparison to thermal-power plant and is required to operate under constraints of water available for hydro generation in a given period of time. Whereas the capital cost of thermal-power plant is less than the hydro-power plant, but its operating cost is high than the hydro-power plant as water is used as fuel in hydro-power plant and which is free of cost in comparison to fuel (coal) used in thermal-power plant. The problem of minimizing the operating cost of a hydrothermal system can be viewed as one of minimizing the fuel cost of thermal-power plants and under the constraints of water availability (storage and inflow) for hydro-generation over a given period of operation. Earlier, a wide variety of optimization techniques have been applied to solving the hydrothermal scheduling problems. Particle swarm optimization method is applied to solve short range hydrothermal scheduling. PSO is a stochastic random search technique that helps to avoid local minimum operating point, so best solution can be achieved with fulfillment of all the constraints. | en |
| dc.description.sponsorship | EIED | en |
| dc.format.extent | 1732713 bytes | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.uri | http://hdl.handle.net/10266/1234 | |
| dc.language.iso | en | en |
| dc.subject | HYDROTHERMAL SCHEDULING, OPTIMIZATION, PSO | en |
| dc.title | Short Range Fixed Head Hydro Thermal Scheduling Using PSO | en |
| dc.type | Thesis | en |