Plant Capability Assessment Using OEE and Teep With Gauge R&R

dc.contributor.authorRamola, Ishwar Chander
dc.contributor.supervisorBatish, Ajay
dc.contributor.supervisorBhattacharya, Anirban
dc.date.accessioned2011-12-12T09:36:19Z
dc.date.available2011-12-12T09:36:19Z
dc.date.issued2011-09-02
dc.descriptionM.E. (Production and Industrial Engineering)en
dc.description.abstractOverall Equipment Efficiency (OEE) metrics are used since a long time to measure the performance of machines. OEE metrics also help to improve the performance of machines by detecting bottleneck areas of the manufacturing lines or machine. The improvement in the productivity in small/medium scale industry where technology used is not so high is a difficult task. The main objective of the present study is to identify the bottlenecks operations find their root causes and implement possible solution to the problems. OEE metrics are used for this purpose. Time and motion study and method study are also done on different machines to reduce the operator fatigue and simplify method. Process study and material flow also studied to improve the material flow and for the purpose of line balancing. Capability assessments of different machines are done by using OEE data and Gage R&R and its relationship also shown with capability index Cp/Cpk.en
dc.format.extent2121069 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.urihttp://hdl.handle.net/10266/1620
dc.language.isoenen
dc.subjectOEEen
dc.subjectProductivity Improvementen
dc.subjectTEEPen
dc.subjectGage R&Ren
dc.titlePlant Capability Assessment Using OEE and Teep With Gauge R&Ren
dc.typeThesisen

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Ishwar(800982007).pdf.pdf
Size:
2.02 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.78 KB
Format:
Item-specific license agreed upon to submission
Description: